Replacement of Pincombes Bridge – Break O’Day Road, Glenburn

Pincombes Bridge Glenburn.jpg

Council is replacing the single-lane Pincombes Bridge on Break O’Day Road in Glenburn.

Council contractors plan to commence works from 16 May 2022, with construction taking place between 7.00 am and 6.00 pm from Monday to Friday for a period of eight weeks.

Works will involve the removal of the existing single-lane bridge and construction of a new two-lane concrete bridge. During the construction period, a temporary Bailey Bridge will be installed over the Yea River, which will operate with reduced speed limits and cater for all traffic. Traffic delays will be kept to a minimum.

Once the project is complete, the existing 100 km/h speed limit will remain in place.

If you are affected by, or have a view about, the proposed project and construction works, we’d like to hear from you. To provide us with your feedback, please visit Council’s online engagement platform, The Loop, or give Council a call on 5772 0333.

/Public Release. View in full here.