UPDATE Bald Hills | Linkfield Road overpass | Night works

National Road Transport Association

From Sunday 11th September, repair works will be carried out to the Linkfield Road overpass at Bald Hills following a high load striking the overpass. These works will be carried out from 7pm to 5am (Sundays to Fridays) and expected to be completed by the end of September 2022, weather and conditions permitting.

Road closures

During these times, lane closures will be in place on the following roads:

  • Linkfield Road overpass
  • Gympie Arterial Road, including southbound off-ramp to Linkfield Road.

To facilitate concrete placement, a full closure will be required from 6pm Saturday 17th September to 8am Sunday 18th September, as well as 5pm Sunday 18th September to 5am Monday 19th September.

Pedestrian and bike rider access will be maintained at all times.

A temporary speed reduction is in place and there is currently no southbound ramp access to Gympie Arterial Road for traffic travelling eastbound on Linkfield Road.

Linkfield Road overpass at Bald Hills remains closed to all vehicles over 4.5 tonnes.

TMR apologises for the inconvenience and delays experienced, however safety is our number one priority.

You must check the Conditions of Operation Database before you start your journey.

Visit the QLDTraffic website, download the app or call 13 19 40 to report an incident or get real-time traffic reports.

/Public Release. View in full here.