Copperlode Dam at 88% capacity

Copperlode Dam was sitting above 88% capacity Monday morning (17 February), is about the same level it was during the same period last year.

Significantly, rainfall in the Copperlode Dam catchment area for December 2021 was 122mm, compared to 206mm for the same period last year. The catchment has already received 199mm this month.

Water production for December 2021 was 2469.3ML – 1928.49ML from Copperlode Dam and 540.81ML from Behana Creek – at a total daily average of 79.65ML.

/Public Release. View in full here.