Top four projects compete for prestigious Australian Construction Achievement Award

Australian Constructors Association and Engineers Australia

Cairns Southern Access Corridor Stage 3: Edmonton to Gordonvale Project (E2G) Cairns, Queensland

By John Holland Group, Seymour Whyte and AECOM

The Cairns Southern Access Corridor, Stage 3: Edmonton to Gordonvale Project (E2G), part of Queensland’s extensive Bruce Highway Upgrade, is a significant infrastructure initiative. Spanning 10.5km, this project aims to duplicate and expand the highway to four lanes, integrate a shared path/cycleway, and reposition a section of the North Coast rail line, enhancing safety, capacity, and flood resilience.

Central Station Metro Sydney, New South Wales

By Laing O’Rourke

Laing O’Rourke is proud to have delivered the $955 million Sydney Metro upgrades to transform Australia’s busiest railway station. The scope included the new Central Walk underground pedestrian concourse, upgrades to the Northern Concourse with a new landmark roof canopy, significant accessibility upgrades with the installation of 14 new lifts and 42 new escalators, and new underground Sydney Metro platforms.

Rookwood Weir Project Gogango, Central Queensland

By Sunwater, GHD, ACCIONA & McCosker Contracting

Rookwood Weir, a mass concrete structure situated on the Fitzroy River in Central Queensland, stands at 16.2m in height and stretches across 350m in length. The project encompasses several key components including a stilling basin designed to dissipate energy from water discharge and environmentally considerate elements to support local wildlife. The construction also includes permanent access roads within the site to ensure ongoing maintenance and operation ease. The project is complemented by associated infrastructure, which highlight the modern engineering and operational capabilities embedded within this significant hydraulic structure.

Western Sydney International Airport Bulk Earthworks Badgerys Creek, New South Wales

By CPB Contractors and ACCIONA

The Western Sydney International Airport Bulk Earthworks (WSABE) Project entails comprehensive land preparation, including excavation, grading, and compaction to establish a stable foundation for the airport infrastructure. The project spanned the excavation, movement, and placement of an almost 27 million square metre of material over the course of five years, setting the stage for construction of the Western Sydney International Airport.

/Public Release.